GlavFundament Novosibirsk: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
| Line 1: | Line 1: | ||
winter pile installation – winter pile installation requires experience. The frozen crust can "deceive" torque readings. We drive the blade below frost depth. Concrete is poured [https://nature-et-avenir.org/ foundation on heaving soils] with antifreeze additives<br>[https://therockpit.net/ winter pile installation] | |||
Revision as of 09:14, 8 November 2026
winter pile installation – winter pile installation requires experience. The frozen crust can "deceive" torque readings. We drive the blade below frost depth. Concrete is poured foundation on heaving soils with antifreeze additives
winter pile installation